

Navarre Dental
After their roofer left membrane off the roof and 2.5” of rain flooded out the first floor and the basement of the building, everything was stripped down to the structure. The client then hired Scott Build to construct the rehab under a time constriction to get up and running as soon as possible. We completed the rehab in 4 weeks’time, bringing the practice up to code and utilizing LED features they didn’t previously have. The building has office space and 4 patient chairs as well as an elegant, spa- like feel that fits the West Minnetonka/Navarre lifestyle.
TESTIMONIAL
Thank you for everything. It feels so great to be back at work. Patient’s love the new remodel and are so impressed that we were able to open so quickly. Couldn’t have done it without you! Thank you!
CLIENT
Christina McCullough
LOCATION
Navarre, MN
SCOPE
Rehab after Water Intrusion
SQUARE FEET
1,500 sq ft
COMPLETION TIME
4 Weeks
SHARE THIS POST